Only search AMC
 

Cote d’Ivoire

2008 Environmental Impact Assessment (EIA)

Democratic Republic of Congo

2009 Open Pit Optimisation and Short Term Mine Planning – Ruashi Mine sprl – Metorex Group

2009 Environmental Scoping Study for the Kamoa Copper Project – Ivanhoe Nickel & Platinum Ltd

2009 Definitive Feasibility Study for the Deziwa Copper-Cobalt Project  Feasibility drill programme management; metallurgical test work and process design work; open pit optimisation, pit design and life of mine scheduling - Platmin Congo sprl
                               
2008 Open Pit Optimisation and Reserve Estimation – Pre-feasibility Study, Musonoi Copper Deposit - Metorex Group

2007 Open Pit Optimisation and Reserve Estimation – Pre-feasibility Study, Lubembe Copper Deposit - Metorex Group

2007 Mining Scoping Study - Whittle based open pit optimisation and design - Kisanfu Copper Project - Phelps Dodge

2007 Environmental Scoping Study for the Kisanfu Project – Phelps Dodge Congo SPRL

2006 Annual Environmental Report of Dikulushi Mine for Anvil Mining Congo SARL. As required by the Mining Code 2003 (in French and English).

2006 Environmental Adjustment Plan (EAP) for Dikulushi Copper-Cobalt Project - Anvil Mining Congo SARL

2004 Base Metal Exploration Project Management: ongoing - The AMC Exploration Services team has been directly involved in the Kamoa Copper Discovery – April 2009 - Ivanhoe Nickel & Platinum Ltd – DRC Base Metals Exploration Project.

2004 Feasibility study for the Kalukundi Mine Project: Mine design, hydrological and environmental aspects. On-going.

2003 Review of the Kalukundi Copper-Cobalt Project - African Lion Limited.

2003 Slope stability and probability of failure studies for the Lonshi Open Pit, First Quantum Minerals Ltd.

2002 Study of stable hangingwall slope angles for the Lonshi Open Pit, First Quantum Minerals Ltd.

2001 Pre-feasibility study of mining options – open pit going underground, for the Dikulushi Project, Anvil Mining NL.

2000 Audit of mining operations at Sodimico Mines (Musoshi and Kinsenda), Glencore AG.

1997 Detailed pre-feasibility study of the Gecamines’ DIMA and KOV open pit mining operations at Kolwezi. Compiled rehabilitation programme / bid documents, Ivanhoe Capital Corporation

1997 Pre-feasibility study of the Musoshi underground mine, including detailed geological and rock mechanics studies

1997 Pre-feasibility study of the Kinsenda underground mine

Ghana

2004 Shaft rehabilitation and underground mine design - Bibiani Mine. Ashanti Goldfields Company

2002 Underground mining option study and slope stability assessment at the Bibiani Mine, Ashanti Goldfields Company

2000 Mining and geotechnical review Obuasi Mine underground operations. Life-of-Mine planning and restructuring for recapitalisation of the deep mine project, Ashanti Goldfields Company

1999 Mining Study rationalisation, medium and long-range planning for underground operations at Obuasi Mine, Ashanti Goldfields Company

Mauritania

2002 Feasibility study for Guelb Moghrein copper-gold project Akjoujt, all open pit and tailings stability and risk assessments

2001 Exploration Project Appraisal - Dubai investor group – Gold Exploration Project

2001 Mining and geotechnical review of the Akjoujt Copper Mine, Dubai investor group

Mozambique

2007 Geotechnical Drilling & Logging Programme - Feasibility Study - Tete Coal Project – CRVD

South Africa

2005 Technical Resource and Reserve Audit of the Hillendale and Fairbreeze Heavy Mineral Deposits, KwaZulu Natal - Kumba Resources Ltd

2005 Technical Resource and Reserve Audit of the Leeuwpan Coal Mine, Leeuwpan Coal Mine - Kumba Resources Ltd

2005 Technical SAMREC complaint Resource and Reserve audit of the Grootegeluk Coal Mine - Grootegeluk Coal Mine - Kumba Resources Ltd

2001 Review of underground mining and backfill systems for Avmin’s Nkomati Mine, South Africa.

Sudan

2000 Exploration Project Management: - Dubai investor group – Hofrat-en-Nahas: Base Metals Exploration Project: 2000-2002

Uganda

2004 Closure and decommissioning plan review environmental audit and re-structuring of core and non-core assets Kilembe Mines Limited, Uganda. - in conjunction with Price Waterhouse Coopers.

Zambia

2009 Konkola Copper Mines – Mine Audit

2008 Resource and Reserve estimation of the Maamba Coal Mine - ZCCM Investment Holdings

2008 Environmental Protection Fund Audit – Ndola Lime Company Limited

2008 Detailed Technical Ore Reserve Audit of Nchanga, Konkola and Nampundwe Mines - Konkola Copper Mines Plc

2008 Environmental Impact Statement (EIS) – Mkushi Copper Project Joint Venture

2008 Environmental Baseline Study (EBS) - Kadola West Prospect – First Quantum Mining and Operations

2008 Environmental Protection Fund Audit – Konkola Copper Mines Plc

2008 Annual Social Environmental Monitoring Report – Konkola Copper Mines Plc

2008 Environmental Protection Fund Audit – Konkola Copper Mine Plc

2007 Environmental Audit and Update of Environmental Management Plans – Chambishi Mine Plc

2007 Mkushi Copper Project Environmental Project Brief – Asia Gold Mining Zambia Limited

2007 Environmental Impact Statement - Cement Plant and Vertical Kiln – Ndola Lime Limited

2007 Environmental Baseline Study for Kashime Copper Project in Mkushi – First Quantum Mining and Operations Limited

2006 Environmental Impact Assessment (EIA) for the extension of the Maposa substation, the construction of the Maposa-Frontier Power Line and the construction of the Frontier substation - Copperbelt Energy Corporation (CEC) Plc

2006 Post Pillar Cut and Fill Mine Design – Reserve calculation and 3D Modelling of orebody, tunnels and geology-Chibuluma South Mine - Metorex Group

2006 Preliminary Resource Estimation and Open Pit Design – Drill hole data entry, geology database creation, orebody modelling, grade model creation and resource estimation for the deposit - Chifupu Copper Resource-Chibuluma South Mine Ltd – Metorex Group

2006 Environmental Scoping Study (ESS) for the Kariba Uranium Project in the Southern Province of Zambia for OmegaCorp Limited

2006 Environmental Project Brief for the Mbuva-Chibolele gemstone mine for Gemfields Holdings (Z) Ltd

2006 Environmental Impact Assessment of the nickel project to be carried out in the Munali Hills Area for Albidon Resources Ltd

2006 Resettlement Action Plan (RAP) for the relocation of the Kachenje and Chinkomba Villages for the Munali Nickel Project of Albidon Resources Limited

2005 Pit optimisation, design and scheduling - Fitwaola Copper Deposit - Konkola Copper Mines Plc

2005 Rock mechanics audit of mining layouts and sequencing for the new Chibuluma South mine – Metorex Group

2005 Review of Metorex Plc capital spending schedule for Investec Bank. Detailed technical and financial appraisal and risk analysis

2004 – 2005 Surpac training and development of mine planning systems for the Nkana and Mufulira Copper Mines, Mopani Copper Mines Plc

2004 Chibuluma South Mine. Underground mining method and backfill review. Metorex Group

2004 Konkola Copper Mines: Operational audit: Standard Chartered Bank Plc.

2004 Konkola Mine: Review of modified overcut and bench mining method and sequencing. Konkola Copper Mines

2004 Bwana Mkubwa / Lonshi Mine: Operational review. Standard Chartered Bank Plc.

2003 Risk analysis of tailings dam and dump design for the Lumwana Copper Project, Equinox Resources.

2003 Monthly operational audits of Sable Zinc operations, Kabwe,

2002 Kansanshi project technical review for consortium of banks. SWOT analysis of all mining and metallurgical aspects.

2002 Geotechnical study for the Lumwana Copper Project, Equinox Resources NL. Management of geotechnical data collection programme and analysis for open pits, tailings dams, plant site.

2002 Geotechnical analysis of alternative mining layouts for the Mindola Deep Mine, Mopani Copper Mines Plc.

2002 Review of mining methods and backfill requirements for the Konkola Mine. Comparison of Bench-and-Fill, Drift and Fill and Post Pillar mining methods. Konkola Copper Mines

2002 Geotechnical review of mining methods appropriate to the extraction of flat dipping resources below an open pit.Mopani Copper Mines Plc.

2001 Geotechnical data collection, analysis and design work for the Kansanshi Open Pits project, First Quantum Minerals

2001 Feasibility study for Mwambashi project, . Open pit and underground mining design, slope stability and underground method selection. Stope design and pillar sizing for mining methods with and without backfill. Avmin plc

2001 Audit of recoverable resources at the Baluba mine, as part of Avmin’s proposed purchase of the Luanshya mine assets.

2001 Backfill strength and system review, Mopani Copper Mines, Mindola Deeps Project.


Zimbabwe

2000 Modelling of underground mining sequences with and without backfill for the Eureka detailed (deep mine) feasibility study on behalf of Delta Gold NL.

2000 Review of mining and rock mechanics for Freda Rebecca Mine. 2-D and 3-D rock mechanics models of stoping and backfill alternatives

1999 Feasibility Study for underground mining at the Eureka Gold deposit for Delta Gold, Zimbabwe. Numerical modelling of stoping alternatives

1999 Review of mining, backfill and rock mechanics for Ashanti Goldfields-Freda Rebecca mine.


African Mining Consultants 2009©